High-Level Process Flow¶
Version: v1.0
1. Purpose¶
Provide a visual & textual overview of end-to-end glucose test strip manufacturing flow from raw materials to finished packaged product.
2. High-Level Stages¶
Environment Classifications¶
- Material Preparation Room: ISO-9
- Test Strips Production Site: ISO-7, Humidity <20%
- Packing Room: Controlled
Production Stages¶
- Material Preparation (L1/L2/L3) — ISO-9
- L1 Electrode Printing & Drying
- L2 Protective Film, Die Cutting
- L3 Decorative Printing & Die Cutting
- L1+L2 Lamination
- Enzyme Solution Preparation
- Line 1: Dispense, Dry @50°C, Vision — ISO-7
- Line 2: L1/L2/L3 Lamination + NG Mark + Row Cut — ISO-7
- Line 3: 6mm Slitting, Vial Fill, Press Cap, Weigh — ISO-7
- Interlock Pass-Through to Packing Room
- Line 4: Label, Box, Weigh, Shrink — Packing Room
- CoA & Ship
3. Production Flow Diagram¶
graph TD
subgraph ISO9["Material Prep Room (ISO-9)"]
A[Raw Materials] --> L1_start[L1: Die Cut]
A --> L2_start[L2: Apply Protective Film]
A --> L3_start[L3: Screen Print Logo 2-color]
L1_start --> L1_print[L1: Screen Print Electrodes]
L1_print --> L1_dry[L1: Dry 130°C Tunnel+Vertical]
L1_dry --> L1_vision[L1: Vision + QR Code]
L1_vision --> L1_store[L1: Store @20% RH]
L2_start --> L2_cut[L2: CCD Die Cut A+B]
L2_cut --> L2_store[L2: Store @20% RH]
L3_start --> L3_dry[L3: Dry 130°C Tunnel+Vertical]
L3_dry --> L3_cut[L3: Die Cut]
L3_cut --> L3_store[L3: Store @20% RH]
L1_store --> Combine_L1L2[Combine L1+L2 @130°C 0.4MPa]
L2_store --> Combine_L1L2
Combine_L1L2 --> HotRoll_AB[Hot Roll A:130°C B:120°C]
HotRoll_AB --> L1L2_store[L1/L2 Combined: Store @20% RH]
end
Enzyme[Enzyme Solution Prep] --> Line1_dispense
subgraph ISO7["Production Site (ISO-7, <20%RH)"]
L1L2_store --> Line1_film[Line 1: Remove Film + Frame]
Line1_film --> Line1_dispense[Line 1: Dispense 3µL ×300 cells]
Line1_dispense --> Line1_dry[Line 1: Dry 50°C 30min]
Line1_dry --> Line1_return[Line 1: Return Frame + Store]
Line1_return --> Line1_vision[Line 1: Vision Check NG→DB]
Line1_vision --> L1L2_enzyme[Accepted L1/L2 + Enzyme]
L1L2_enzyme --> Line2_combine[Line 2: Combine +L3 @120°C pin pos]
L3_store --> Line2_combine
Line2_combine --> Line2_hotroll[Line 2: Hot Roll 120°C]
Line2_hotroll --> Line2_punch[Line 2: NG Mark]
Line2_punch --> Line2_rowcut[Line 2: 30mm Row Cut + Split]
Line2_rowcut --> All_rows[All Rows → Store Good/Partial/NG]
All_rows --> Line3_slit[Line 3: 6mm Slitter manual mode for partial]
Line3_slit --> Line3_vial[Line 3: Strips slide into Vials]
Line3_vial --> Line3_cap[Line 3: Press Cap]
Line3_cap --> Line3_scale[Line 3: Scale Count Check]
Line3_scale --> Interlock[Interlock Pass-Through Chamber]
end
subgraph Pack["Packing Room"]
Interlock --> Line4_label[Line 4: Label date/code/variation]
Line4_label --> Line4_box[Line 4: Box Pack + Manual]
Line4_box --> Line4_weigh[Line 4: Weigh Check]
Line4_weigh --> Line4_shrink[Line 4: Shrink Wrap 12-box]
end
Line4_shrink --> Ship[CoA + Ship]
4. Interfaces¶
| Interface | Upstream Output | Downstream Input | Control Point |
|---|---|---|---|
| Enzyme Solution to Dispense | Validated batch (pH, activity) | Dispense step | Batch Record |
| Vision NG Map | Defect coordinate list | NG Marker/Puncher | DB Cross-check |
| Row Output | Segregated Good/Partial/NG rows | Slitting | Physical label + traveler |
| Partial Row Process | Partial-defect rows | Manual slitter mode | Operator + reject count |
| Interlock Transfer | Capped vials (scale verified) | Packing Room | Transfer log |
5. Change Impact¶
Any process flow change requires revision of affected SOP numbers & quality risk assessment.
Revision History: v1.0 Initial release.